Rollingwood has approved a place for dogs at Rollingwood Park, but it has not approved a construction project yet. The City Council adopted a general layout in May that includes a 0.59-acre off-leash area. Since then, the work has moved to engineering, drainage and paving. The most likely source of funding is the sales tax collected at Rollingwood's businesses. A September staff estimate put the hardscape at about $535,000, which is roughly three years of what that sales tax brings in. The cost estimate and that revenue stream will set the pace more than any vote on the dog area.
Here is how the plan got to this point and what has to happen before anyone opens a gate at Upper Park.
What Council Actually Approved in May
On May 13, 2026, Rollingwood City Council voted 5–0 to adopt "Plan 16" as the general layout for improvements at Rollingwood Park. According to the City's meeting packet, the layout includes:
- A 0.59-acre off-leash area
- A revised parking layout
- Removal of the north parking area
- Irrigation improvements
Council held off on fencing and other specifics and left them for later review. That limit still matters. The May vote settled the size of the dog area and where the parking would shift. It did not settle what the fence looks like, what surface dogs would run on, or what rules would apply.
The Parks Commission had already backed the 0.59-acre design. Citizen Portal reported a unanimous recommendation on May 12. A month earlier, designers had shown the commission several options. These included reconfigured upper fields, a possible off-leash area, and a parking reorganization that would add roughly 10 spaces. At that time, they estimated parking alone at $250,000 to $400,000 before excavation.
The parking estimate came first. The dog area has been tied to the parking lot from the start.
How the Plan Moved From Layout to Bid Package
After May, things moved quickly. Here is the record from the City's packet:
| Date | Body | Action |
|---|---|---|
| May 13, 2026 | City Council | Adopted Plan 16 layout, 5–0, fencing reserved for later |
| June 8, 2026 | Rollingwood Community Development Corporation | Reaffirmed intent to fund all or part, depending on available funds and total cost |
| June 9, 2026 | Park Commission | Told staff was seeking pricing and a potential engineer |
| June 17, 2026 | City Council | Authorized the mayor to develop a bid package, 5–0 |
| September 14, 2026 | RCDC | Heard staff estimate of about $535,000 in hardscape |
The June 9 minutes describe what Council approved as the 0.59-acre option and a concrete parking lot. The June 17 motion requires the finished bid package to come back to Council before it moves forward. To build it, staff worked with Sitio Designs, Robert Dial of Dial Development Services, and City Engineer Lochner on rough cost estimates, drainage options, and the cost of materials and labor.
Fencing in half an acre of grass is simple. Moving a parking lot and handling the water that runs off new pavement is where the money and engineering go.
The Paving Question Behind the Price
By mid-September, the estimate had a number. Citizen Portal's summary of the September 14 RCDC meeting reports a staff estimate of about $85,000 for engineering and $450,000 for construction, or roughly $535,000 in hardscape.
That total is higher than the full $250,000–$400,000 parking range from April. The two figures were measured differently. The April range covered parking before excavation. The September number covers engineering plus construction for the combined Upper Park parking and off-leash work. The direction of the change is still useful. As the design became more specific, the price went up, and it went up because of hardscape.
Board members spent part of that meeting on concrete versus asphalt and the lifecycle costs of each. Concrete usually costs more at the start. Over decades, maintenance can tip the comparison the other way. Council's June language referred to a concrete lot, so the RCDC discussion shows that the material choice is still open at the funding stage.
The board was also clear about what its figure means. Citizen Portal's summary records this:
Board agreed on budget line items and that the budget is an initial estimate, not a contract award.
Where the Money Would Come From
The funding source is the part of this story most residents can see in their own spending. The Rollingwood Community Development Corporation is funded by local sales tax. According to Citizen Portal, receipts run about $13,000 to $15,000 a month. RCDC's balance sheet showed about $1,000,260, which recent checks bring down to roughly $900,000.
Set the estimate against that revenue. At $15,000 a month, $535,000 is about 36 months of collections. At $13,000 a month, it is about 41. Either way, the hardscape costs roughly three years of the development corporation's sales tax income. The current balance could cover it, but it would use more than half of what RCDC has on hand.
That explains the two questions on the board's agenda. The first is whether RCDC pays for the whole project or the City contributes. Members debated that directly. The second is the process. Members talked through defining projects, holding hearings, a 60-day publication period, and City Council review before any money is spent. The board approved a budget motion for the park line by a 4–1 vote. Its adopted budget also added line items for irrigation and part-time maintenance.
The same meeting connected the park to Rollingwood's businesses in another way. RCDC budgeted $5,000 for a shop-local mailer. Merchants would submit one-page ads, and the mailer would go out with the monthly water bill, about 600 pieces. The board also declined to pursue a small business loan program. Sales at local businesses fund the corporation that would build the dog area, so promoting those businesses also supports that budget.
City dollars are a separate question. Rollingwood approved its FY 2026–27 budget and tax rate on September 16. Community Impact's budget coverage lists $708,023 in Parks general-fund spending but does not break out an appropriation for the off-leash area or the parking lot.
The Steps Between a Drawing and a Gate
In September, RCDC sent staff away with a specific list. Combined with the June Council motion, the path ahead looks like this:
- Finish engineering drawings and drainage calculations.
- Pursue TCEQ review.
- Return with a refined cost estimate before procurement.
- Publish project definitions and bring detailed plans and cost updates back for formal approval.
- Bring the final bid package to City Council for consideration.
No bids have been solicited or awarded, and no contractor or construction dates have been set. Fencing, surface and dog-area rules also remain open. The three bodies involved were scheduled back to back in the week of October 19. RCDC was set for Monday, October 19, at 5:30 p.m., the Park Commission for Tuesday, October 20, at noon, and City Council for Wednesday, October 21, at 7 p.m. in City Hall Council Chambers at 403 Nixon Drive. Meeting dates are listed on the City of Rollingwood calendar.
At Upper Park in the Meantime
Upper Park is a busy place, which is one reason the parking layout gets so much attention. A Park Commission agenda this year listed updates on the east driveway and parking area alongside items for Western Hills Little League and Western Hills Girls Softball. Western Hills Little League says fall baseball runs from roughly the second week of September and wraps up before Thanksgiving, so the fields stay in use for another few weeks.
The next large gathering there is Halloween. The Rollingwood Police Department's annual Trunk-or-Treat is Saturday, October 31, from 4 to 6 p.m., at Rollingwood Upper Park, 3111 Gentry Drive. That afternoon will put cars, families and the current parking layout to a real test.
For dog owners who cross into Austin, the city's Parks and Recreation Department says dogs must be leashed in public except in designated off-leash areas. It also says dogs should stay leashed while walking to and from those areas. Its off-leash program page links to the 2026 map of designated sites.
When the refined estimate comes back, the concrete-versus-asphalt choice and the question of who pays will shape the off-leash area as much as the fence design does.
At Sovereign Place Real Estate, Stephanie Taylor follows Rollingwood projects like this one because changes to a park, its parking and its drainage affect the blocks around Gentry Drive. If you'd like to talk through what the Upper Park plans could mean for your street or your plans, Stephanie is glad to sit down with you.